A documented sequence
From plot
to handover.
A private residence becomes easier to manage when decisions, drawings, procurement and site work happen in the right order.
- 01
Plot Understanding
Read the site, access, context, orientation and project intent before design begins.
- 02
Architecture & Planning
Develop the plan, massing and spatial character with coordinated decisions.
- 03
Budget + Scope Freeze
Define specifications, exclusions, allowances and commercial assumptions before mobilisation.
- 04
Engineering & Approvals
Coordinate structural and services engineering with the approval pathway.
- 05
Site Mobilisation
Establish the site, programme, safety controls, logistics and reporting rhythm.
- 06
Structure
Execute RCC and masonry through planned checks and documented hold points.
- 07
MEP + Waterproofing
Coordinate concealed services and waterproofing before finishes close the work.
- 08
Finishes
Manage samples, mock-ups, workmanship benchmarks and installation sequencing.
- 09
Interior Execution
Coordinate joinery, kitchens, lighting and interior finishes against approved drawings.
- 10
Testing + Handover
Test systems, close observations, assemble records and hand over in a structured manner.
Milestones with meaning.
Programme and commercial milestones are tied to defined outputs. The exact deliverables, dependencies and review periods are documented for each project.
Approvals, weather, design changes, long-lead procurement and owner decisions can affect a project programme; these are surfaced rather than hidden behind a fixed generic promise.